The initial phase of construction (what DC Blox initially applied for permits for) is for 69k square feet at 10 MW.
But that is only a corner of the property that DC Blox acquired. Other documents filed during the permitting process include their long-term plan for the property, and that's where the 50 MW number comes from-- two buildings totaling 345k square feet of data center space, a 72k square foot electrical substation, plus support facilities (parking, guard houses, etc.).
Looks like it. Plus it looks like they’re closer to a traditional screen sprinting shop in that they just take a file and will work with you manually tweak and adjust things to look good, rather than just printing a file straight away
The stars featured in the movie and in this chart (and in the book) are real, and reflect their real-world locations.
The planets around the stars, aside from our own solar system (obviously), are fictional-- both Tau Ceti and 40 Eridani are stars where we're looking for exoplanets, but we don't have strong evidence for either yet.
You can trick the user into copying the same malicious link, but browsers have generally already implemented the same mitigation that is Microsoft's fix for this issue inside Notepad (specifically, prompting before opening outside applications after the user enters or clicks a URL that isn't one of the built-in schemes).
It is also possible to use a different application as the http and file: url handler at the os level;
Write an app to display the (URL) argument passed and require the user to confirm or reject before running the browser using any of one or more default and configurable command line templates.
Add a "Install as default http, https, file:// uri handler" button in the settings gui. Prompt the user to install the app as default handler on first run.
Add opt-in optional debug logging of at least: {source_app_path:, url:, date_opened: } to a JSON lines log file
`git add -f` will add ignored files. Once you've done that, any files you've added will be part of your commit regardless of the contents of .gitignore.
Also, files that are added to .gitignore after they’ve already been committed will still appear as modified. To stop tracking them, you need to remove them from the index (staging area):
Bose's original plan was to remove all WiFi-dependent functionality (no AirPlay and no Spotify Connect)-- while they wouldn't quite be "dumb speakers" at that point (since Bluetooth would've still worked), it would've turned them into pretty much just overcomplicated Bluetooth speakers.
There's even a clear example of this in the non-legendary teams: both of them include Slaking, presumably because it has a particularly high base stat total (the highest of any non-legendary, and matching some legendaries).
But Slaking doesn't get that for free-- it has an ability (Truant) that means it can only use moves every other turn. That limits its usefulness outside of a couple very specific scenarios, and means that it'll usually be outperformed by significantly "weaker" Pokemon (going purely by numbers).
And that's just one of the factors you'd need to take into account to build a team optimizer that's actually useful. Actually building a team has to take into account a massive number of factors: roles for each Pokemon (not just what types they can counter), available movesets, any advantages or disadvantages provided by abilities, your opponents' team composition, etc... it's a big problem to try to solve.
My understanding is that LPL is not still practicing (he says he's retired, to focus on security work), but I'd guess he knows someone, if McNally didn't already have his own lawyer.
I mean, it's not exactly a secret. If you really want to know you can look it up online. He even has a whole talk he gives about why he generally doesn't reveal his identity. People send him packages with trackers hidden in them, hire private investigators to follow him with bogus stories, etc.
But that is only a corner of the property that DC Blox acquired. Other documents filed during the permitting process include their long-term plan for the property, and that's where the 50 MW number comes from-- two buildings totaling 345k square feet of data center space, a 72k square foot electrical substation, plus support facilities (parking, guard houses, etc.).